OFFICE CIRCULARS ARCHIVES

Serial NumberSubject
105Monthly Returns by Contractors after action taken on risk &cost of the contractor (Size: 92.52 KB, Format: PDF, Language: English)
104Regarding completion of Road Work (Size: 67.16 KB, Format: PDF, Language: English)
103Construction of bridges in MP (Size: 84.79 KB, Format: PDF, Language: English)
102Metal /Plastic Speed Breaker not in use (Size: 32.23 KB, Format: PDF, Language: English)
101Period for Performence Guarentee for Road Const. works in P.W.D. (Size: 36.8 KB, Format: PDF, Language: English)
100Upgradation of MDR (Size: 27.18 KB, Format: PDF, Language: English)
99Directions for Drainage Layer and Hard Shoulders(by Govt.) (Size: 33.78 KB, Format: PDF, Language: English)
98Procurement of Goods (Size: 48.59 KB, Format: PDF, Language: English)
97Works Regarding Crusher run Macadum(C.R.M) base sub/sub base (Size: 34.99 KB, Format: PDF, Language: English)
96CE,SE,EE and PIU Officials tour diary (Size: 65.9 KB, Format: PDF, Language: English)
95Training for Site Engineers by field staff of the Department and Contractors (Size: 0 B, Format: , Language: )
94Circular on Registration (Size: 173.17 KB, Format: PDF, Language: English)
93Construction of Concreate Pavement (Size: 173.17 KB, Format: PDF, Language: English)
92Directions for Drainage Layer and Hard Shoulders (Size: 65.24 KB, Format: PDF, Language: English)
91Quality Monitoring in construction of Rigid Pavements on Concreat Road (Size: 127.67 KB, Format: PDF, Language: English)
90MDR Sandharan (Size: 606.89 KB, Format: PDF, Language: English)
89Training in Different Institutions (Size: 88.6 KB, Format: PDF, Language: English)
88Plantation of Trees on both side of Roads (Size: 130.83 KB, Format: PDF, Language: English)
87Rationalization of Pre Qualification in Tenders (Size: 68.05 KB, Format: PDF, Language: English)
86Demarkashan of old roads in existing National Highways (Size: 51.81 KB, Format: PDF, Language: English)